Short answer
It depends on the job: how many people and vehicles the site needs, how long the work runs, when it happens and what kind of road it's on. If you need a traffic management plan designed, that's quoted separately. Every job is priced individually, and your nearest branch puts the quote together.
What affects the price
- Crew size. A footpath job might need one or two people. A lane closure on a busy road needs an STMS and several traffic controllers.
- How long. The number of shifts, and the hours in each, make the biggest difference.
- When. Night, weekend and public holiday work can be priced differently from weekday day shifts.
- The road. Faster, busier roads and state highways need more signs, more space and more people.
- The plan. Most jobs need an approved plan. You can supply your own, or MW Training & Planning can design one, quoted separately.
Who prepares your quote
Quotes come from your nearest branch. Each branch has its own rates, and the team there knows the local roads, the councils and what the site will need.
Getting an accurate quote
Request an estimate and tell us:
- Where the work is.
- The dates and hours, including any nights or weekends.
- What the work is, and how much of the road or footpath it takes up.
- Whether you already have an approved plan.
Keeping costs down
- Book early, so the plan and approvals are sorted before the day.
- Keep closures as short as you can, and group work into the same shifts.
- Tell us about changes early. Late cancellations can be charged, and our terms set out the notice periods.
Got a question about your job? Call 0800 636 289 or request an estimate.