CoPTTM, the old code of practice, has been replaced by the New Zealand Guide to Temporary Traffic Management (NZGTTM). Instead of set layouts, traffic management is now planned around the actual risks at each site. It's been required on state highways since 1 October 2025, and councils are moving across on their own timelines.
What changed
CoPTTM worked mostly from standard layouts, with set distances, signs and controls for each type of road and job. The NZGTTM starts from the risks at your site: who could get hurt, how, and which controls deal with that on that road at that time.
In practice, the controls fit the site more closely. Some jobs end up with fewer, some with more.
MW Training & Planning covers risk-based planning in more detail on their services page.
Key dates
- December 2024. NZTA said CoPTTM had been superseded by the NZGTTM as its preferred guidance. CoPTTM stays on the NZTA website but is no longer updated.
- 1 October 2025. Traffic management on NZTA projects and state highways must follow the NZGTTM.
What it means for your job
- New plans are designed under the NZGTTM, so yours may look different from what you're used to.
- Not sure what your council needs? Check with the road controlling authority, or ask us.
See getting a TMP approved for who approves plans in each region.
Training and qualifications
Training and qualifications are changing too. MW Training & Planning covers that on their training page.